LIST OF RECOMMENDED WORKS UNDER MLA- LAD SCHEME 27 – TUIKUM (ST) A/C (from 2015-2016)
2015 – 2016 ( 1st INSTALLMENT)
Sl.No | Name of work | Amount sanction | Implementing Agency |
1 | 2 | 3 | 4 |
1 | Constrctionof waiting shed at Zarte kawn,Tlungvel | 68,000/- | Joint YMA, Tlungvel |
2 | Pavement of road with PCC near Pu Nghaka house at Tlungvel | 32,000/- | YMA, Tlungvel Venghlun |
3 | Construction of MHIP building at Khumtung(walling of ground floor) | 45,000/- | MHIP Khumtung |
4 | Pavement of road with PCC near Pi Nghahmawii house at Khumtung | 1,00,000/- | V.C. Khumtung |
5 | Flooring of Chhiahtlang Venghlun Volleyball Court with PCC | 95,000/- | V.C., Chhiahtlng |
6 | Constructionof public urinal near Millenium H/S at Chhiahtlang | 28,000/- | Ropuiliana Br. MHIP Chhiahtlang |
7 | Renovation of MHIP building at Baktawng(internal breast wall masonry) | 25,000/- | MHIP Dawr Veng,Baktawng |
8 | Upgradation of MHIP building at Baktawng Tlangnuam | 45,000/- | MHIP Baktawng Tlangnuam |
9 | Construction of village economic road from Kawnpui to seluphan at Baktawng Tlangnuam | 2,40,000/- | V.C. Baktawng Tlangnuam |
10 | Construction of MHIP building at Chhingchhip Venghlun(ground floor slab) | 45,000/- | MHIP Chhingchhip Venghlun |
11 | Construction of waiting shed at Tuizal Tlang,Phulmawi | 60,000/- | MHIP Phulmawi |
12 | Construction of public Hall at Buhkangkawn(erection of colum,beam,roof from ground floor to roof) | 65,000/- | MUP Buhkangkawn |
13 | Widening of approach road at Zotuithiang Thlanmual (f/c) at Chhiahtlang | 75,000/- | V.C., Chhiahtlang |
14 | Widening of road between Romawii house and Lalsawmi house at Chanmari, Chhiahtlang | 50,000/- | V.C., Chhiahtlang |
15 | Levelling, ramming and consolidated of volleyball court with excavated earth at Chhiahtlang Venghlun | 13,000/- | YMA, Kawn Veng Br. Chhiahtlang |
LIST OF RECOMMENDED WORKS UNDER MLA- LAD SCHEME 27 – TUIKUM (ST) A/C
(from 2015-2016)
2015 – 2016 ( 1st INSTALLMENT)
Sl.No | Name of work | Amount sanction | Implementing Agency |
1 | 2 | 3 | 4 |
16 | Constructionof link kroad between _ In Venghlun and V.Lalnghaka In Sailam Chhiahtlang | 38,000/- | YMA, Kawn Veng Br. Chhiahtlang |
17 | Flooring of approach road of Camp tlang with PCC at Baktawng Dawr Veng | 1,00,000/- | V.C., Baktawng |
18 | Plastering of Joint YMA Run with Cement mortar at Baktawng | 65,000/- | Joint YMA,Baktawng |
19 | Construction of public urinal near Baktawng Field | 25,000/- | Joint YMA,Baktawng |
20 | Clearing of YMA Park by Manual at Charkhan, Baktawng | 15,000/- | Joint YMA,Baktawng |
21 | Construction of public urinal near Kapzuala house at Hmawngkawn | 15,000/- | YMA, Hmawngkawn |
22 | Widening of Govt. M/S approach road by manual at Hmawngkawn | 20,000/- | YMA, Hmawngkawn |
23 | Upgradation of road with motorable from Mualpuikawn to MHIP building at Mualpui, Chhingchhip | 1,00,000/- | V.C., Mualpui Chhingchhip |
24 | Upgradation of Govt. P/S building at Darlawng 1) flooring with PCC 2) extn. Of verandah roof with timber structure | 1,00,000/- | V.C., Darlawng |
25 | Renovation of Govt. M/S at Sialhau | 30,000/- | V.C., Sialhau |
26 | Construction of public gallery of Chhingchhip Venghlun playground @ Church side | 1,00,000/- | YMA, Venghlun Br. Chhingchhip |
27 | Upgradation of Lungpho thlanmual approach road by manual | 15,000/- | YMA Lungpho |
28 | Construction of public urinal near Lungpho playground | 25,000/- | YMA Lungpho |
29 | For purchase of materials of public utility | 4,13,510/- | MLA, 27-Tuikum (ST) A/C |
30 | Construction of waiting shed at Thingse kawi at Khumtung | 50,000/- | YMA Khumtung |
LIST OF RECOMMENDED WORKS UNDER MLA- LAD SCHEME 27 – TUIKUM (ST) A/C
(from 2015-2016)
2015 – 2016 ( 1st INSTALLMENT)
Sl.No | Name of work | Amount sanction | Implementing Agency |
1 | 2 | 3 | 4 |
31 | Construction of urinal near Community Hall at Hmuntha | 40,000/- | MHIP Hmuntha |
32 | Tuirini Link road kawng ba sam | 15,490/- | Farmer’s Union Baktawng |
33 | Construction of Vengthar thlanmual In at Tlungvel | 50,000/- | YMA Vengthar Br. Tlungvel |
34 | Construction of Venglai YMA Library upto plinth level at Baktawng | 32,000/ | YMA Venglai Br. Baktawng |
35 | Construction of MHIP Chhingchhip Venglai building upto plinth level | 45,000/- | MHIP Venglai Br. Chhingchhip |
36 | Construction of RCC column of MHIP building at Tlungvel (ground floor to roof) | 42,000/- | MHIP Tlungvel |
37 | Construction of masonry wall,covering of drain with RCC and leveling of road with PCC near waterpump at Mualpui,Chhingchhip | 33,000/- | V.C. Mualpui Chhingchhip |
38 | Construction of Govt. Primary School toilet at Darlawng | 15,000/- | V.C. Darlawng |
39 | Construction of SHG Federation building with timer structure at Baktawng | 29,000/- | Self Help Group, Baktawng |
40 | Construction of volleyball court at Tlungvel venghlun sh : earthwork @ f/c | 20,000/- | V.C. Tlungvel |
41 | Plastering work of YMA building at Phulmawi | 31,000/- | YMA Phulmawi |
TOTAL | 24,50,000/- |
LIST OF RECOMMENDED WORKS UNDER MLA- LAD SCHEME 27 – TUIKUM (ST) A/C
(from 2015-2016)
2015 – 2016 ( 2ND INSTALLMENT)
Sl.No | Name of work | Amount sanction | Implementing Agency |
1 | 2 | 3 | 4 |
1 | For purchase of materials of public utility | 7,37,000/- | MLA, 27-Tuikum (ST) A/C |
2 | Khumtung – Phulmawi footpath kawng ba sam | 11,000/- | MUP Khumtung |
3 | Filling of pot-hole and clearing of landslide of Vanchengte main road | 23,000/- | Sub-Village Committee,Vanchengte |
4 | Flooring of volleyball court with PCC at Vengthlang, Khawbel | 1,02,000/- | YMA Khawbel |
5 | Construction of public urinal near Information Centre at Hmuntha | 18,000/- | YMA Hmuntha |
6 | Hmuntha – Maite kawng ba sam | 11,000/- | YMA Hmuntha |
7 | Construction of waiting shed at Hmuntha thlanmual | 75,000/- | YMA Hmuntha |
8 | Construction of Lungpho-Chalphai economic road at Lungpho | 3,75,000/- | BDO Serchhip |
9 | Flooring of Tlangval volleyball court PCC at Thentlang | 1,02,000/- | MHIP Thentlang |
10 | Construction of masonry step near Govt. M/S at Sialhau | 45,000/- | MHIP Sialhau |
11 | Construction of tuikhur at Lungpho-Chalphai economic road at Lungpho | 10,000/- | V.C. Lungpho |
12 | Construction of masonry step near Lalngaiha house at Lungpho | 90,000/- | V.C. Lungpho |
13 | Construction of public urinal near Kailiana house at Baktawng Venghlun | 30,000/- | V.C. Baktawng |
14 | Construction of masonry step near YMA property at Hualtu | 80,000/- | MUP Hualtu |
15 | Extension of MUP building at Hualtu | 35,000/- | MUP Hualtu |
16 | Construction of MHIP building at Hualtu sh:foundation and column upto plinth level | 40,000/- | MHIP Hualtu |
17 | Construction of mini bridge at Bawngsikawr at Tlungvel sh: foundation and column upto plinth level | 75,000/- | V.C. Tlungvel |
LIST OF RECOMMENDED WORKS UNDER MLA- LAD SCHEME 27 – TUIKUM (ST) A/C
(from 2015-2016)
2015 – 2016 ( 2ND INSTALLMENT)
Sl.No | Name of work | Amount sanction | Implementing Agency |
1 | 2 | 3 | 4 |
18 | Construction of public latrine and urinal near C/Hall at Ngentiang | 75,000/- | YMA Ngentiang |
19 | Construction of approach road of Zawlmangi khum at Ngentiang sh:f/C | 30,000/- | MUP Ngentiang |
20 | Construction of public urinal near Hruaimawia house at Thinglian | 25,000/- | MUP Thinglian |
21 | Construction of public shed at Rullam sh: ground floor slab | 95,000/- | MUP Rullam |
22 | Construction of public urinal near Lalnunzawma house at Thinglian | 25,000/- | MUP Thinglian |
23 | Construction of MHIP building at Rullam sh: structure and roof with timber | 40,000/- | MHIP Rullam |
24 | Construction of MHIP building at Thinglian sh: structure and roof with timer | 40,000/- | MHIP Thinglian |
25 | Upgradation of Khamhnuai kawng upsto Bawngsikawr sh:earthwork | 25,000/- | V.C. Tlungvel |
26 | Flooring of RMS H/S courtyard with PCC at Thinglian | 26,000/- | V.C. Thinglian |
27 | Construction of sanitation building at Tlungvel | 36,000/- | MUP Gate Veng,Tlungvel |
28 | Construction of Hmunliam tuikhur at Sialhau | 30,000/- | MHIP Sialhau |
29 | Khawbel-Rullam kar kawng ba sam upto Ramri kawn | 20,000/- | MHIP Khawbel |
30 | Construction of urinal near Govt. P/S at Khawbel | 20,500/- | MHIP Khawbel |
31 | For purchase of materials of public utility | 1,03,500/- | MLA, 27-Tuikum(ST)A/C |
TOTAL | 24,50,000/- |
LIST OF RECOMMENDED WORKS UNDER MLA- LAD SCHEME 27 – TUIKUM (ST) A/C
(from 2015-2016)
2016 – 2017 ( 1st INSTALLMENT)
Sl.No | Name of work | Amount sanction | Implementing Agency |
1 | 2 | 3 | 4 |
1 | Constn. of waiting shed at Pautu kawn at Tlungvel | 50,000/- | YMA Tlungvel Gate Veng |
2 | Constn. of public urinal near Zotui kawr at Tlungvel | 18,000/- | Joint YMA Tlungvel |
3 | Joint YMA Park samfai at Tlungvel | 22,000/- | Joint YMA Tlungvel |
4 | Constn. of YMA Run at Chhiahtlang | 30,000/- | YMA Hmar Veng Br. Chhiahtlang |
5 | Renovation of YMA Library at Chhiahtlang | 50,000/- | YMA Co-ordination, Chhiahtlang |
6 | Constn. of public hall at Buhkangkawn sh: walling with bricks and fixing choukut | 75,000/- | MUP Buhkangkawn |
7 | Retaining of Bawngsikawr mini bridge foundation with stone masonry at Tlungvel | 75,000/- | YMA Field Veng Br. Tlungvel |
8 | Pavement of road with PCC near Khawlkungi house at Mualpui,Chhingchhip | 1,00,000/- | V.C. Mualpui Chhingchhip |
9 | Pavement of road jwith PCC bear Vankhumtluanga house at Baktawng Dawr Veng | 1,00,000/- | V.C. Baktawng |
10 | Construction of Thlanmual In at Mualpui thlanmual II at Mualpui Chhingchhip | 65,000/- | YMA Mualpui Chhingchhip |
11 | Constn. of step with RCC between Multipurpose Hall and Govt. P/S at Baktawng Tlangnuam | 2,99,000/- | V.C. Baktawng Tlangnuam |
12 | Constn. of Baktawng Venghlun YMA building sh: ground floor slab | 65,000/- | YMA Venghlun Br. Baktawng |
13 | Constn. of HMES Office building at Baktawng sh: walling and roofing | 55,000/- | V.C. Baktawng |
14 | Constn. of MUP waiting shed at Dawrkawn Baktawng | 50,000/- | MUP Unit Baktawng |
15 | Extension of Millenium H/S building at Chhiahtlang | 30,000/- | V.C. Chhiahtlang |
16 | Contn. of Baktawng Dawr veng YMA building sh: foundation and column upto plinth level | 50,000/- | YMA Dawr veng Br. Baktawng |
17 | Retaining of MHIP Co-ordination Run with S/M at Venghlun Chhiahtlang | 32,000/- | MHIP Co-ordination, Chhiahtlang |
18 | Upgradation of MUP building at Tlungvel sh: flooring and walling of basement I | 65,000/- | MUP Tlungvel Area |
LIST OF RECOMMENDED WORKS UNDER MLA- LAD SCHEME 27 – TUIKUM (ST) A/C
(from 2015-2016)
2016 – 2017 ( 1st INSTALLMENT)
Sl.No | Name of work | Amount sanction | Implementing Agency |
1 | 2 | 3 | 4 |
19 | Constn. of Tlungvel Br, MHIP building sh: roofing with GS sheet | 40,000/- | MHIP Tlungvel |
20 | Painting of internal and external wall of Tlungvel HSS building at Gate Veng Tlungvel | 39,000/- | V.C. Tlungvel |
21 | Constn. of MHIP Venghlun building at Chhingchhip sh: basement I slab | 55,000/- | MHIP Venghlun Br. Chhingchhip |
22 | Widening and constn. of diversion road from Vankeukawn to Mualpui upto VC boundary | 95,000/- | V.C. Chhingchhip |
23 | Constn. of MHIP Chhingchhip venglai Br. Building at Chhingchhip Venglai sh: gound floor slab | 55,000/- | MHIP Venglai Br. Chhingchhip |
24 | Constn. of Lungpho to Chalphai economic road ph-II | 1,89,000/- | BDO Serchhip |
25 | Constn. of Anganwadi Centre No. 6 building at Chanin sh: walling and timber flooring of basement-I | 25,000/- | V.C. Baktawng |
26 | Pavement of road with PCC near Nghahmawii house at Lenhnuai Khumtung | 55,000/- | V.C. Khumtung |
27 | Contn. of Chanmari Br. YMA ChhiahtlangLibrary building at Chhiahtlang | 50,000/- | YMA Chanmari Br. Chhiahtlang |
28 | Pavement of approach road of Govt. M/S with PCC at Phulmawi | 75,000/- | YMA Phulmawi |
29 | Upgradation of farmer Hall at Chhingchhip Venghlun | 50,000/- | MUP Chhingchhip Venghlun |
30 | Widening and constn. of Mualpui to Vankeukawn diversion road upto VC boundary | 2,25,000/- | VC Mualpui Chhingchhip |
31 | Constn. of S/M/ wall near Ramlai Tuikhur at Hmawngkawn | 75,000/- | MHIP Hmawngkawn |
32 | Constn. of pavement of approach road of Thlanmual near Pi Zamu house with PCC at Darlawng | 95,000/- | VC Darlawng |
LIST OF RECOMMENDED WORKS UNDER MLA- LAD SCHEME 27 – TUIKUM (ST) A/C
(from 2015-2016)
2016 – 2017 ( 1st INSTALLMENT)
Sl.No | Name of work | Amount sanction | Implementing Agency |
1 | 2 | 3 | 4 |
33 | Constn. of MHIP building at Darlawng sh: erection of column from ground to floor kto roof and roofing | 45,000/- | MHIP Darlawng |
34 | Constn. of MHIP building at Khumtung sh: erection of RCC coloumn from first floor to roof and roofing | 65,000/- | MHIP Khumtung |
35 | House site plan at Chhiahtlang sh: Dilkawn to Lungdai @ earthwork | 95,000/- | V.C. Chhiahtlang |
36 | House site plan at Chhiahtlang sh: Farhmun Hmarveng @ FC | 1,60,000/- | V.C. Chhiahtlang |
37 | Lungpho to Sialhau kawng ba sam at Lungpho sh: ramrikawn to VC boundary | 28,000/- | Tawi Group YMA |
38 | Lungpho kto Ngentiang kawng ba sam at Lungpho sh: sekikawn to Rinzami Lungkawn | 27,000/- | Tawi Group YMA |
39 | Constn. of MUP building at Baktawng Tlangnuam sh: foundation & column upto plinth level | 55,000/- | MUP Baktawng Tlangnuam |
40 | For purchase of materials of public utility | 4,71,020/- | MLA, 27-Tuikum (ST) A/C |
41 | Renovation of Phulmawi YMA building sh: Painting and plastering | 40,000/- | YMA Phulmawi |
42 | Filling of road pot-hole with stone boulder between Sialhau peng to Vanchengte | 30,000/- | Sub-Village Committee, Vanchengte |
43 | Vertical extendion of Chhuanthar Hall at Baktawng Tlangnuam | 2,25,000/- | VC Baktawng Tlangnuam |
44 | Chhiahtlang Higher Secondary School as Grant-in-Aid | 50,000/- | Managing Board Chhiahtlang HSS |
45 | Constn. of Bawngsikawr Mini bridge at Tlungvcl sh: alignment(earthwork) main beam and cross beam | 1,20,000/- | V.C. Tlungvel |
46 | Upgradation of Venghlun MHIP building at Tlungvel sh: fencing | 28,000/- | MHIP Tlungvel Venghlun |
47 | Vengthar thlanmual kawng ba sam at Tlungvel | 13,500/- | MUP Tlungvel Vengthar |
48 | Upgradation of volleyball court at Baktawng Dawr Veng | 42,000/- | V.C. Baktawng |
49 | For purchase of Radiant Baby Warmer as Grant-in-Aid | 34,000/- | PHC Ngentiang |
LIST OF RECOMMENDED WORKS UNDER MLA- LAD SCHEME 27 – TUIKUM (ST) A/C
(from 2015-2016)
2016 – 2017 ( 1st INSTALLMENT)
Sl.No | Name of work | Amount sanction | Implementing Agency |
1 | 2 | 3 | 4 |
50 | Constn. of Baktawng Tlangnuam YMA building sh: foundation nd column with RCC upto plinth level | 60,000/- | YMA Baktawng Tlangnuam |
51 | Constn. of public urinal near Tuirial bridge at Tlungvel | 32,000/- | YMA Vengthar Br. Tlungvel |
52 | YMA ram samfai at Sialhau | 25,000/- | YMA Sialhau |
53 | Sialhau to Chhiahtlang kawng ba sam upto Vanchengte Peng | 25,000/- | YMA Sialhau |
54 | House site plan at Chhiahtlang Chhim veng near MJ Zakunga house sh: FC | 85,000/- | V.C. Chhiahtlang |
55 | House site plan at Chhiahtlang Venghlun @ thlanmual kawng chung sh: FC | 70,000/- | V.C. Chhiahtlang |
56 | Upgradation of Badminton Court at Community Hall at Baktawng | 22,000/- | V.C. Baktawng |
57 | Renovation of Darlawng C/Hall sh: painting and window repair | 40,000/- | V.C. Darlawng |
58 | Constn. of retaining wall at Chhingchhip Mualpui playground @ eastern side near North corner | 35,000/- | MHIP Mualpui Chhingchhip |
59 | Chhiahtlang to Sialhau kawng ba sam upto VC boundary | 30,000/- | V.C. Chhiahtlang |
60 | Chhiahtlang to Bukpui (short cut) kawng ba sam | 20,000/- | V.C. Chhiahtlang |
61 | Leveling of playground by mechanical means at Field Veng, Tlungvel | 20,000/- | V.V. Tlungvel |
62 | Constn. of public urinal near Muankima house at Venghlun Chhingchhip | 30,000/- | MHIP Chhingchhip Venghlun |
63 | Constn. of Venglai YMA building at Chhingchhip sh: foundation and column upto plinth level | 50,000/- | YMA Venglai Br. Chhingchhip |
64 | Constn. of public urinal near lamhnai tuikhur at Venghlun Chhingchhip | 24,000/- | MHIP Venghlun Br. Chhingchhip |
65 | Constn. of public urinal near C/Hall at Thentlang | 28,000/- | MUP Thentlang |
66 | Thentlang to Chhingchhip(Footpath) kawng ba sam upto VC boundary | 27,000/- | MUP Thentlang |
67 | Thentlang to Sialhau(main road) kawng ba sam upto VC boundary | 25,000/- | MUP Thentlang |
LIST OF RECOMMENDED WORKS UNDER MLA- LAD SCHEME 27 – TUIKUM (ST) A/C (from 2015-2016)
2016 – 2017 ( 1st INSTALLMENT)
Sl.No | Name of work | Amount sanction | Implementing Agency |
1 | 2 | 3 | 4 |
68 | Constn. of S/M breast wall near Lalnunnema house at Lane hnuai,Khumtung | 36,480/- | V.C. Khumtung |
69 | Constn. of public urinal near playground at Khumtung | 25,000/- | V.C. Khumtung |
70 | Lane hnuai(extension area) samfai at Khumtung | 25,000/- | V.C. Khumtung |
71 | Constn. of Bawngsikawr mini bridge at Tlungvel sh: strengthening of main beam and cross at both ends with stone masonry | 38,500/- | V.C. Tlungvel |
72 | Constn. of public urinal at Hmuntha peng, Chhingchhip | 45,000/- | MHIP Chhingchhip Venghlun |
73 | Thentlang to Khawbel kar kawng sam from Thentlang to Pu Peka Ram | 26,000/- | MUP Thentlang |
74 | Thentlang to Khawbel kar kawng sam from Pu Peka Ram to River Tuikual | 26,000/- | MUP Thentlang |
75 | Constn. of Hualliana H/S(Govt. Adhoc Aided) building at Hmuntha sh: R/wall sto retain the building | 95,000/- | Managing Committee, Hualliana H/S Hmuntha |
76 | Renovation of Sialhau Community Hall | 68,000/- | YMA Sialhau |
77 | Thlanmual kawng siam at Thinglian | 15,000/- | MUP Thinglian |
78 | Constn. of waiting place near Community Hall at Chhingchhip Venghlun | 45,000/- | V.C. Chhingchhip |
LIST OF RECOMMENDED WORKS UNDER MLA- LAD SCHEME 27 – TUIKUM (ST) A/C (from 2015-2016)
2016 – 2017 ( 2nd INSTALLMENT)
Sl.No | Name of work | Amount sanction | Implementing Agency |
1 | 2 | 3 | 4 |
1 | Constn. of slab culvert at VC boundary at Mualpuikawn to Vankeukawn diversion road at Chhingchhip | 1,05,000/- | MUP Venghlun Chhingchhip |
2 | Constn. of Lungpho to Chalphai economic road at Lungpho Phase III | 3,04,000/- | BDO Serchhip |
3 | For purchase of materials of public utility | 5,53,990/- | MLA, 27-Tuikum(ST) A/C |
4 | Chhuanthar HSS, Baktawng Tlangnuam as Grant-in-Aid | 30,000/- | Managing Board Chhuanthar HSS Baktawng Tlangnuam |
5 | Constn.of slab culvert near Engmawia house at Mualpuikawn to Vankeukawn diversion road at Mualpui Chhingchhip | 75,000/- | V.C. Mualpui Chhingchhip |
6 | Clearing of landslip at Mualpuikawn to Vankeukawn diversion road at Chhingchhip Mualpui | 10,000/- | V.C. Mualpui Chhingchhip |
7 | Constn. of volleyball court at Thinglian sh: a) FC b) flooring with PCC c) gallery with stone masonry | 1,62,000/- | MUP Thinglian |
8 | Neihlaia lamlung(cultural heritage) kawng ba sam at Ngentiang | 16,500/- | MUP Ngentiang |
9 | Extension of MHIP building at Ngentiang | 25,000/- | MHIP Ngentiang |
10 | Clearing of landslip and upgradation of approach road of Zawlmangi khum (cultural heritage) at Ngentiang | 20,000/- | MUP Ngentiang |
11 | Constn. of pavilion at Ngentiang playground | 1,80,000/- | YMA Ngentiang |
12 | Pavement of approach road and verandah of C/Hall with PCC at Ngentiang | 65,000/- | YMA Ngentiang |
13 | Constn. of approach road of Vengchung near Lalramsiama house at Rullam sh: FC | 63,000/- | V.C. Rullam |
14 | Constn. of public shed at Rullam sh: column from ground floor to first floor and first floor slab | 1,20,000/- | MUP Rullam |
15 | Constn. of MHIP building at Rullam sh: timber flooring fixing door and window | 45,000/- | MHIP Rullam |
16 | Hmun hlui samfai at Rullam | 25,000/- | YMA Rullam |
17 | YMA Plantation samfai at Chipte thantlang at Rullam | 25,000/- | YMA Rullam |
LIST OF RECOMMENDED WORKS UNDER MLA- LAD SCHEME 27 – TUIKUM (ST) A/C (from 2015-2016)
2016 – 2017 ( 2nd INSTALLMENT)
Sl.No | Name of work | Amount sanction | Implementing Agency |
1 | 2 | 3 | 4 |
18 | Constn. of RCC balcony for approach of lane hnuai near Lalnunnema house at Khumtung | 1,60,000/- | V.C. Khumtung |
19 | Constn. of Hualliana H/S building at Hmuntha sh: foundation and column upto plinth level | 1,25,000/- | BDO Serchhip |
20 | Constn. of new lane from Pi Hrati tuikhur to Barigate at Baktawng phase-I sh:FC | 1,54,500/- | V.C. Baktawng |
21 | Constn. of upper river Mat Zau economic road at Chhingchhip sh: FC(Chawilung Peng-Pu Rinthanga leilet) | 1,26,000/- | YMA Venghlun Br. Chhingchhip |
22 | PCC flooring of volleyball court at Hualtu | 1,20,000/- | MUP Hualtu |
23 | Constn. of MHIP building at Hualtu sh: RCC column from ground floor to roof | 65,000/- | MHIP Hualtu |
24 | Constn. of Hmundo economic kroad at Hualtu | 1,16,000/- | V.C. Hualtu |
25 | Repairing of Govt.P/S building at Phulmawi | 35,000/- | V.C. Phulmawi |
26 | Oainting of Joint YMA Run at Baktawng | 32,500/- | Joint YMA Baktawng |
27 | Constn. of side drain with stone masonry and slab covering near Zorami house at Hmawngkawn | 19,000/- | YMA Hmawngkawn |
28 | Constn.of Govt. P/S Office verandah with stone masonry at Hmawngkawn | 25,000/- | MUP Hmawngkawn |
29 | Constn. of tuikhur with S/M at Venglai mual Hmawngkawn | 38,000/- | V.C. Hmawngkawn |
30 | Upgradation kof MHIP building at Hmawngkawn | 28,000/- | MHIP Hmawngkawn |
31 | Clearing of landslip and excavation of rocky portion near kawrpui at Tuiphu kawng Baktawng Tlangnuam | 35,000/- | YMA Baktawng Tlangnuam |
32 | Khawbel-Thentlang kar kawng sam upto river Tuikual | 26,500/- | MUP Khawbel |
33 | Constn. of S/M wall at C/Hall Peng Khawbel | 50,000/- | YMA Khawbel |
34 | Constn. of approach road of C/Hall at Khawbel sh: FC including disposal of excavated earth with tripper | 96,000/- | YMA Khawbel |
LIST OF RECOMMENDED WORKS UNDER MLA- LAD SCHEME 27 – TUIKUM (ST) A/C (from 2015-2016)
2016 – 2017 ( 2nd INSTALLMENT)
Sl.No | Name of work | Amount sanction | Implementing Agency |
1 | 2 | 3 | 4 |
35 | Constn. of MHIP building at Khawbel sh: erection of timber structure roofing and flooring | 50,000/- | MHIP Khawbel |
36 | Constn. of approach road of Darlawng Tlang tuikhur | 1,02,600/- | V.C. Darlawng |
37 | Constn.of 2 nos minipump house for Darlawng mini water supply scheme @ pumping cement tuikhur | 26,000/- | V.C. Darlawng |
38 | Fencing of playgfound with wire mash at Thentlang @ N.E. side | 70,000/- | MUP Thentlang |
39 | Constn. of Hualliana H/S building at Hmuntha sh: erection of column ground floor to roof walling and roofing | 4,10,000/- | Managing Committee,Hualliana H/S Hmuntha |
40 | Constn. of MHIP building at Thinglian sh: PCC flooring and fixing door and window | 28,000/- | MHIP Thinglian |
41 | Pavement of half portion of Mualzawl near C/Hall with PCC at Lungpho | 1,90,000/- | V.C. Lungpho |
42 | Constn.of intake of Tuitui at Chawnglurtlang for miniwater supply scheme at Vanchengte | 15,000/- | Sub-Village Committee,Vanchengte |
43 | Constn.of masonry wall near C/Hall at Khawbel | 30,000/- | V.C. Khawbel |
44 | Upgradation of Khawbel YMA Library building | 55,000/- | YMA Khawbel |
45 | Thlanmual kawng ba sam at Sialhau | 15,000/- | MUP Sialhau |
46 | Renovation of door,window,ventilation of Sialhau Community Hall | 60,000/- | YMA Sialhau |
47 | Clearing of water pipeline area from Sialhau to Buanhmun for miniwater supply scheme at Sialhau | 26,000/- | YMA Sialhau |
48 | Upgradation of playgroundat Hualtu sh: Levelling, cutting and leveling | 73,000/- | MUP Hualtu |
49 | Constn. of volleyball court at Hualtu sh: FC including disposal excavated earth by tripper | 86,000/- | MUP Hualtu |
50 | Constn. of pavilion at Thentlang P/G sh: foundation and column upto plinth level | 49,000/- | MUP Thentlang |
LIST OF RECOMMENDED WORKS UNDER MLA- LAD SCHEME 27 – TUIKUM (ST) A/C (from 2015-2016)
2016 – 2017 ( 2nd INSTALLMENT)
Sl.No | Name of work | Amount sanction | Implementing Agency |
1 | 2 | 3 | 4 |
51 | Constn. of waiting shed at Mualkawi, Thentlang | 50,000/- | YMA Thentlang |
52 | Upgradation of Sahlam tuikhur at Thentlang | 49,000/- | V.C. Thentlang |
53 | Constn. of Hualliana H/S at Hmuntha sh: flooring with PCC | 70,000/- | MUP Hmuntha |
54 | Constn. of balcony for approach of Lenhnuai at Khumtung sh: wing wall and approach slab with RCC | 25,000/- | MHIP Khumtung |
55 | Constn. of Sialhau MHIP building | 50,000/- | MHIP Sialhau |
56 | Constn. of Tuirial link road via Thingthupui tuikhur at Baktawng Tlangnuam phase-I sh: clearing upgrade and FC | 1,45,000/- | MUP Chhuanthar Tlangnuam |
57 | Thlanmual kawng ba sam at Chhingchhip | 25,910/- | Joint YMA Chhingchhip |
58 | For purchase of materials of public utility | 1,13,030/- | MLA, 27-Tuikum (ST) A/C |
59 | Khumtung to Chawlhhmun kawng ba sam | 25,000/- | YMA Khumtung |
60 | Khumtung to Zilngau kawng ba sam | 25,000/- | YMA Khumtung |
61 | Upgradation of Lungpho MHIP building sh: extension of room basement-I | 25,000/- | MHIP Lungpho |
62 | Constn. of masonry wall near MHIP building at Lungpho | 25,000/- | MHIP Lungpho |
63 | Thlanmual samfai at Lungpho | 10,470/- | MUP Lungpho |
TOTAL | 50,00,000/- |